Federally-Funded Infrastructure
Federal projects
Post-BABA federal awards for infrastructure. The hard-wired lighting & electrical scope on these jobs must meet Build America, Buy America — so the recipient (the owner) is a decision-maker who needs domestic-compliant product. 490 of the largest awards · 50 states · obligated since May 2022.
Serve this market · MD
Rep agencies in MD, ranked by the domestic-compliant lines they carry — who to call to source BABA product locally, and which compliant lines they rep.
Commercial Lighting Sales
5 compliantBAABABATAAUS-madeCurrent GLI BrandsMyers EPSStarTek Lighting AmericaU.S. Outdoor LightingWilliams
Statewide
One Source Associates
3 compliantBAATAAUS-madeContech LightingCurrent HLI BrandsNLS Lighting
Statewide
Chesapeake Lighting
3 compliantBAABABATAAUS-madeCooper Lighting SolutionsEvenliteSternberg Lighting
Statewide
District Lighting Group
2 compliantBAABABAUS-madeDiode LEDLucetta
Statewide
Federated Lighting
2 compliantBAABABATAAUS-madeAcuity BrandsLumenpulse
Statewide
Lighting Environments
1 compliantBAABABATAAUS-madeSensorWorx
Statewide
+ 9 more MD agencies (no resolved compliant lines — all MD agencies →)
Who specs the work · MD
Electrical engineering firms in MD — the consultants who spec the electrical/lighting scope.
9 projects in MD · $17.3B obligated
CLIMATE UNITED FUND
$7.0BMDEnvironmental Protection Agency2024-04
THIS AGREEMENT PROVIDES FUNDING UNDER THE INFLATION REDUCTION ACT (IRA) TO CLIMATE UNITED (CU). THE RECIPIENT WILL UTILIZE THE FUNDING TO REDUCE EMISSIONS OF GREENHOUSE GASES AND OTHER AIR POLLUTANTS; DELIVER BENEFITS OF GREENHO
NATIONAL RAILROAD PASSENGER CORPORATION
$3.9BMDFederal Railroad Administration2024-11
THE EXISTING BALTIMORE POTOMAC (B P) TUNNEL, LOCATED BENEATH WEST BALTIMORE, DATES FROM THE CIVIL WAR ERA. AT OVER 150 YEARS OLD, IT IS THE OLDEST TUNNEL ALONG THIS SECTION OF THE NEC. BECAUSE OF EVER INCREASING TUNNEL MAINTENANCE ISSUES AN
POWER FORWARD COMMUNITIES, INC
$2.0BMDEnvironmental Protection Agency2024-04
THIS AGREEMENT PROVIDES FUNDING UNDER THE INFLATION REDUCTION ACT (IRA) TO POWER FORWARD COMMUNITIES (PFC). THE RECIPIENT WILL UTILIZE THE FUNDING TO REDUCE EMISSIONS OF GREENHOUSE GASES AND OTHER AIR POLLUTANTS; DELIVER BENEFIT
NATIONAL RAILROAD PASSENGER CORPORATION
$1.6BMDFederal Railroad Administration2024-11
THE SUSQUEHANNA RIVER BRIDGE (SRB) REPLACEMENT PROJECT INCLUDES FINAL DESIGN AND CONSTRUCTION TO REPLACE THECURRENT, EXISTING TWO (2) TRACK BRIDGE WITH TWO (2) NEW FIXED, TWO (2) TRACK BRIDGES FOR A TOTAL OF FOUR (4) TRACKS FOR OVERTHE SUSQ
X ENERGY, LLC
$922MMDDepartment of Energy2021-02
COMPETITIVE COOPERATIVE AGREEMENT: ADVANCED REACTOR DEMONSTRATION FOA# DE-FOA-0002271 PATHWAY 1 ADVANCED REACTOR DEMONSTRATIONS (DEMOS) AWARD TO X ENERGY, LLC THIS PROGRAM IS INTENDED TO FACILITATE THE DEVELOPMENT OF U.S. PRIVATE INDUSTRY A
MARYLAND TRANSIT ADMINISTRATION
$897MMDFederal Transit Administration
MARYLAND PURPLE LINE LRT GRANT (FFGA)
MARYLAND TRANSIT ADMINISTRATION
$407MMDFederal Transit Administration2023-03
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO SUPPORT MARYLAND TRANSIT ADMINISTRATION (MTA) OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH DECEMBER 31 2022.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO COVER ALL ELIGI
MARYLAND TRANSIT ADMINISTRATION
$395MMDFederal Transit Administration2020-07
MARYLAND TRANSIT ADMINISTRATION SECTION 5307-6 CARES ACT GRANT-OPERATING ASSISTANCE
MARYLAND PORT ADMINISTRATION
$146MMDEnvironmental Protection Agency2025-01
THE PURPOSE OF THIS AWARD IS TO PROVIDE FUNDING UNDER THE INFLATION REDUCTION ACT (IRA) TO MARYLAND PORT ADMINISTRATION. SPECIFICALLY, THE RECIPIENT WILL PROCURE NEW ZERO EMISSION (ZE) VEHICLES AND EQUIPMENT AND THE ASSOCIATED C
Source: USASpending.gov — assistance awards obligated since 2022-05-14, captured 2026-06-24. The largest awards shown; recipients are owners/pass-through entities. Open federal solicitations (SAM.gov) are a planned add.